Home Menu

Four bespoke, brightly coloured floating roofs identify the Metrolink stop as a ’pavilion’ within Exchange Square and ensure that it is visible in long views along Corporation Street. On stop ‘furniture’ such as information displays and seating is integrated into polished concrete columns to give the stop a clean, uncluttered design.

Project information

  • Client

    Transport for Greater Manchester

  • Status

    Completed

  • Start

    2014

  • Completion

    2015

  • Consultants

    Structural Engineer: Jacobs
    Main Contractor: MPT

  • Elements

    New Metrolink tram stop

Core Team

Location